• <tr id='thfCCf'><strong id='thfCCf'></strong><small id='thfCCf'></small><button id='thfCCf'></button><li id='thfCCf'><noscript id='thfCCf'><big id='thfCCf'></big><dt id='thfCCf'></dt></noscript></li></tr><ol id='thfCCf'><option id='thfCCf'><table id='thfCCf'><blockquote id='thfCCf'><tbody id='thfCCf'></tbody></blockquote></table></option></ol><u id='thfCCf'></u><kbd id='thfCCf'><kbd id='thfCCf'></kbd></kbd>

    <code id='thfCCf'><strong id='thfCCf'></strong></code>

    <fieldset id='thfCCf'></fieldset>
          <span id='thfCCf'></span>

              <ins id='thfCCf'></ins>
              <acronym id='thfCCf'><em id='thfCCf'></em><td id='thfCCf'><div id='thfCCf'></div></td></acronym><address id='thfCCf'><big id='thfCCf'><big id='thfCCf'></big><legend id='thfCCf'></legend></big></address>

              <i id='thfCCf'><div id='thfCCf'><ins id='thfCCf'></ins></div></i>
              <i id='thfCCf'></i>
            1. <dl id='thfCCf'></dl>
              1. <blockquote id='thfCCf'><q id='thfCCf'><noscript id='thfCCf'></noscript><dt id='thfCCf'></dt></q></blockquote><noframes id='thfCCf'><i id='thfCCf'></i>
                  工程动态  
                太行山高速manbetx最壕赞助商邯郸段七标段梁板预制圆满完成
                发布日期:2018年06月30日     【字体:  

                20186251830分,太行山高速manbetx最壕赞助商邯郸段七标段制梁场内鞭炮齐鸣,随着最后◥一片预制T梁圆满浇筑完成,标志着邯郸段七标段施工∮生产进入全新阶段。

                 

                七标段预●制梁板共计468片,其中30T108片,40米正交T192片,斜交70°T168片。自首片梁板成功浇筑以▓来,七标段在项目公司和筹建处领导鼎力支持下,在总监办△和总包部的全力帮扶下及七标段项目领导班子的带领●下,始终紧抓“安全、质量、进度”,克服种种困难,严格按照“高标准、严要求、重质效”的建◣设方针,战酷暑、斗严寒,确保了梁板预制任务的顺√利完成。

                  

                七标段梁板预制的圆满完成,为七标段西甲赞助商manbetx工程整体进度目标的完成奠定了基础,有力的支持了年底通车的目标进度。

                上一篇文章:运营管理中心召开2018年度首次项目管理会
                下一ω篇文章:没有了
                关闭窗口】    【返回顶部